1、設(shè)備出現(xiàn)異常應(yīng)立即停車(chē)檢修,故障排除后再行運(yùn)轉(zhuǎn)。
1, abnormal equipment should immediately stop maintenance, troubleshooting after the operation.
2、各處軸承和鏈輪處應(yīng)定期加住潤(rùn)滑脂和潤(rùn)滑油,減速機(jī)6個(gè)月加注一次,
2, each place bearing and sprocket should regularly add grease and lubricating oil, reducer once every 6 months,
板壓段的導(dǎo)軌及兩導(dǎo)軸應(yīng)經(jīng)常加注潤(rùn)滑油。
Lubricating oil should be often added to the guide rail and the two guide shaft of the pressure plate.
3、每工作5000小時(shí)后,應(yīng)對(duì)角接觸球軸承進(jìn)行清洗,添加NBU-15潤(rùn)滑脂或鋰基潤(rùn)滑脂(SY1412-75),添加量為內(nèi)腔面積的1∕3~2∕3左右,軸承達(dá)不到精度時(shí)可更換。切記:清洗干燥部分的清洗室不能任何潤(rùn)滑油和非中性液體,避免水源被污染。
3, every 5000 hours of work, should the angular contact ball bearing cleaning, NBU-15 grease or lithium grease additive (SY1412-75), was added to the 1 lumen area / 3 ~ 2 / 3 or so, can not reach the accuracy of bearing replacement. Remember: cleaning the drying part of the cleaning room can not be any lubricating oil and non neutral liquid, to avoid water pollution.
4、經(jīng)常檢查電氣線路,有否破損或鼠咬,各接頭處有否松動(dòng),電控箱內(nèi)應(yīng)保持整潔、干燥。
4, often check the electrical circuit, whether damaged or rodent bite, the joints are loose, the electrical control box should be kept clean and dry.
5、每段氣缸及其它活動(dòng)處要經(jīng)常注入潤(rùn)滑油,電磁閥板應(yīng)保持清潔,接頭可靠
5, each segment of the cylinder and other activities should be regularly injected lubricating oil, solenoid valve plate should be kept clean, reliable joints
6、設(shè)備上的灰塵應(yīng)及時(shí)擦凈,設(shè)備背靠板、背靠輪要保持清潔,每個(gè)工作班次要及時(shí)清除灰塵和雜質(zhì)。
6, dust on the equipment should be promptly wiped, equipment back plate, back wheel to keep clean, each work shift should promptly remove dust and impurities.
7、三聯(lián)體(分水濾氣器每班防水,每周清洗一次,壓力表調(diào)至0.5~0.8mpa,油霧器保持一定油位,機(jī)械油(N32#)滴油時(shí)調(diào)整到每分鐘一滴左右。
7, three conjoined (water separator gas filter each class waterproof, cleaning once a week, the pressure gauge is adjusted to 0.5 ~ 0.8MPa, oil mist to maintain a certain oil level, mechanical oil (N32#) drops when the oil is adjusted to about one drop per minute.
8、經(jīng)常檢查螺栓聯(lián)結(jié)處有否松動(dòng),若有應(yīng)及時(shí)緊固。
8, often check whether the bolt connection is loose, if there should be timely fastening.
9、設(shè)備長(zhǎng)時(shí)間不用時(shí),應(yīng)將設(shè)備擦凈,用塑料布罩好,以防積塵、銹蝕。
9, when the equipment is not used for a long time, the equipment should be cleaned, covered with plastic cloth, in order to prevent dust accumulation, corrosion.
有了
鋁切割設(shè)備上面的小總結(jié),希望對(duì)廣大客戶有所幫助,如果有什么不理解的或者尋求幫助的請(qǐng)點(diǎn)擊我們的官方網(wǎng)站:
http://www.hnyfqpj.cn或者來(lái)電咨詢,我們會(huì)盡全力為您解決
A small sum aluminum cutting equipment above, hope to help customers, if what you do not understand or seek help please click on our official website: http://www.hnyfqpj.cn or contact us, we will do our best for you to solve